Nevzenit

A-800Fee split by DNR-STB phase

Fee splitcalculator.

Split a fee across the seven DNR-STB design and delivery phases, in euros. Free, with no account.

Working in pounds? Fee split calculator by RIBA stage

Your fee

Plain arithmetic on this page. Your figures stay in this tab until you choose a PDF.

Fee by phase

No starting split is shown. Enter your own share for each phase.

Phase
Share
Fee
Phase 1Spatial structure design (SO)
Phase 2Preliminary design (VO)
Phase 3Final design (DO)
Phase 4Technical design (TO)
Phase 5Tendering and contract (PC)
Phase 6Construction-ready design (UO)
Phase 7Site supervision (Directievoering)
Total
Phases total 0%
Fees show at 100%

Phases total 0%

The phase names come from the DNR-STB, published by BNA and NLingenieurs. Nevzenit is independent and is not affiliated with or endorsed by BNA or NLingenieurs. The shares are yours, not guidance from either.

A-801The phases

What each phase covers.

The DNR-STB, the task description of BNA and NLingenieurs, divides design and delivery into phases. This page uses seven of them, with the Dutch abbreviations. In short:

  1. Phase 1Spatial structure design (SO)An early study of how the building sits on the site and how its spaces relate. This phase is optional.
  2. Phase 2Preliminary design (VO)The first complete design: form, layout and character, for the client to approve.
  3. Phase 3Final design (DO)The design fixed: dimensions, materials and the main technical choices agreed.
  4. Phase 4Technical design (TO)The agreed design worked into drawings and specifications that show how it is built.
  5. Phase 5Tendering and contract (PC)Preparing the tender, answering contractors' questions and helping to draw up the building contract.
  6. Phase 6Construction-ready design (UO)The detailed drawings and coordination a contractor needs to build.
  7. Phase 7Site supervision (Directievoering)Directing the works for the client: following progress and quality on site.

A-802Splitting a fee

Set the split to match your appointment.

Every appointment weights the phases differently, and none starts with a share filled in here. Enter a share for each phase, and set a phase to 0 if your appointment leaves it out. The phases before design and after hand-over are not on this page.

Fees show once the phases total exactly 100%. Each phase is its exact share of the fee, in cents when it does not come out whole, so the column always adds up to the fee and matches the fee proposal it opens.

Questions

Quick answers.

What percentage of the fee goes to each phase?

There is no single right split, and this page does not suggest one. It depends on the services agreed, the project and how your practice charges. Enter your own shares.

Does this work out my fee?

No. It divides the fee you enter, either as a total or as a share of the construction cost. The shares are yours to set.

Is VAT included?

No. Enter your fee excluding VAT. The page adds nothing to it and takes nothing from it.

Can I use another currency?

No. Amounts on this page are in euros. For pounds, use the fee split calculator by RIBA stage.

Is anything I type stored?

No. Nothing you type here is stored, and the page uses no AI. It only does the arithmetic.

Can I keep the result?

Download it as a one-page PDF on A4 paper with your phases, shares and amounts.

A-803From a split to a proposal

A fee proposal ismore than a split.

Nevzenit drafts the proposal from the project's memory: the scope, each stage, the exclusions and the payment schedule, ready for you to check before it is sent.

A drawing of an open proposal book on a stone table: a pencil perspective of a courtyard house above ruled lines, window light across the page.