Fee splitcalculator.

Split a fee across the RIBA Plan of Work 2020 stages, in pounds. Free, with no account.

Working in dollars? Fee split calculator by AIA phase

Your fee

Plain arithmetic on this page. Your figures stay in this tab until you choose a PDF or a fee proposal.

Fee by stage

An example starting split. Change any stage to suit your project.

Stage
Share
Fee
Stage 0Strategic Definition
No amount
Stage 1Preparation and Briefing
No amount
Stage 2Concept Design
No amount
Stage 3Spatial Coordination
No amount
Stage 4Technical Design
No amount
Stage 5Manufacturing and Construction
No amount
Stage 6Handover
No amount
Stage 7Use
No amount
Total
100%
No amount

RIBA and the RIBA Plan of Work are trade marks of the Royal Institute of British Architects. Nevzenit is independent and is not affiliated with or endorsed by RIBA. The split shown is an example, not RIBA guidance.

A-801The stages

What each stage covers.

The RIBA Plan of Work 2020 divides a building project into eight stages, numbered 0 to 7. In short:

  1. Stage 0Strategic DefinitionThe client's strategic case and what the project must achieve.
  2. Stage 1Preparation and BriefingThe brief, the project objectives and the site information.
  3. Stage 2Concept DesignThe design concept, tested against the brief.
  4. Stage 3Spatial CoordinationThe design coordinated across the disciplines.
  5. Stage 4Technical DesignThe technical information needed to make and build.
  6. Stage 5Manufacturing and ConstructionThe building made on site, with design queries answered.
  7. Stage 6HandoverThe building handed over and the project closed out.
  8. Stage 7UseThe building in use, and what it teaches.

A-802Splitting a fee

Set the split to match your practice.

Every practice weights the stages differently. The weight depends on the services agreed, the project and how the practice charges.

Fees show once the stages total exactly 100%. Each stage is its exact share of the fee, in pence when it does not come out whole, so the column always adds up to the fee and matches the fee proposal it opens.

Questions

Quick answers.

Why do Stages 0 and 7 start at 0%?

The example split puts the work in Stages 1 to 6. A stage at 0% adds nothing until you give it a share.

Can I use another currency?

No. Amounts on this page are in pounds. For US dollars, use the fee split calculator by AIA phase.

Can I keep the result?

Download a one-page PDF with your stages, shares and amounts, or press Turn this into a fee proposal to carry your figures into a new project's Fee screen after sign-in.

A-803From a split to a proposal

A fee proposal ismore than a split.

Nevzenit drafts the proposal from the project's memory: the scope, each stage, the exclusions and the payment schedule, ready for you to check before it is sent.

Want to see one finished? Read a sample fee proposal

A drawing of an open proposal book on a stone table: a pencil perspective of a courtyard house above ruled lines, window light across the page.