Nevzenit

A-800Fee split by NZCIC stage

Fee splitcalculator.

Split a fee across the eight stages of the NZCIC design guidelines, in New Zealand dollars. Free, with no account.

Working in pounds? Fee split calculator by RIBA stage

Your fee

Plain arithmetic on this page. Your figures stay in this tab until you choose a PDF.

Fee by stage

No example split is offered. Type the share for each stage; fees show once the stages total 100%.

Stage
Share
Fee
Stage 1Project Establishment
Stage 2Concept Design
Stage 3Preliminary Design
Stage 4Developed Design
Stage 5Detailed Design
Stage 6Procurement
Stage 7Construction Administration and Observation
Stage 8Post Completion
Total
Stages total 0%
Fees show at 100%

Stages total 0%

The stage names are those of the New Zealand Construction Industry Council's design guidelines. Nevzenit is independent and is not affiliated with or endorsed by the NZCIC or the NZIA. The split shown is yours, not NZCIC guidance.

A-801The stages

What each stage covers.

The New Zealand Construction Industry Council's design guidelines divide a building project into eight stages, numbered 1 to 8. In short:

  1. Stage 1Project EstablishmentThe brief, the budget and the programme agreed, and the site information gathered.
  2. Stage 2Concept DesignThe first options explored and one concept shown to the client.
  3. Stage 3Preliminary DesignThe chosen concept developed into a coordinated design for approval.
  4. Stage 4Developed DesignThe design fixed: sizes, materials, structure and services worked through together.
  5. Stage 5Detailed DesignThe drawings and specification a contractor prices and builds from.
  6. Stage 6ProcurementChoosing a contractor: tender documents, questions and a review of the tenders.
  7. Stage 7Construction Administration and ObservationThe architect's part while the building goes up: site observation at intervals.
  8. Stage 8Post CompletionDefects followed up, final documents handed over and the project closed out.

A-802Splitting a fee

Set the split to match your practice.

No split is offered here. Every practice weights the stages differently, and the weight depends on the services agreed, the project and how the practice charges. Type your own share for each stage.

Fees show once the stages total exactly 100%. Each stage is its exact share of the fee, in cents when it does not come out whole, so the column always adds up to the fee and matches the fee proposal it opens.

Questions

Quick answers.

What percentage of the fee goes to each stage?

There is no single right split. It depends on the services agreed, the project and how your practice charges. There is no starting split here, so type the share for each stage.

Does this work out my fee?

No. It divides the fee you enter, either as a total or as a share of the construction cost. The shares are yours to set.

Can I use another currency?

No. Amounts on this page are in New Zealand dollars. For pounds, use the fee split calculator by RIBA stage.

Does it add GST?

No. It splits the figure you type and adds nothing to it.

Is anything I type stored?

No. Nothing you type here is stored, and the page uses no AI. It only does the arithmetic.

Can I keep the result?

Download it as a one-page A4 PDF with your stages, shares and amounts.

A-803From a split to a proposal

A fee proposal ismore than a split.

Nevzenit drafts the proposal from the project's memory: the scope, each stage, the exclusions and the payment schedule, ready for you to check before it is sent.

A drawing of an open proposal book on a stone table: a pencil perspective of a courtyard house above ruled lines, window light across the page.